PACS Spectroscopy Integration Estimates
PACS Spectroscopy AORs
Preparing for Science Demonstration Phase (SDP)
- Chopping and Wavelength Switching overlays (JD's website)
- Notes
Chopper throw options: 1',3',6'
n1097 is 9.3'x6.3'
n4559 is 10.7'x4.4'
Primary SDP 15 Oct -> 30 Nov; Secondary 01 Oct -> 15 Dec
- Comments
now using HSPOT v4.2
wavelength switching now requires sky integrations
n1097+n4559 time budget in hours: 20.6 (v3.4) -> 21.7 (v4.2 w/no offset in sky position) -> 23.4 (v4.2 w/offset); 49.7 (v4.2 w/chop)
If flux estimates are not provided, bright continua and lines are assumed -> largest integration capacitors used, at risk of lower S/N for faint targets (p.3 HSpot changes doc)
- Questions
Do we select "chop/nod" or "chop/nod (bright lines)"?
Do we constrain the chop angle (or date of obs)?
Can we longitudinally dither for strips?
Last modified: 2009 Jul 12





